IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

November 24, 2001
(Click for hi-res image)
Pedestal Construction
After the concrete placement was complete, the entire area was covered with plastic sheeting and pumped with
warmed air to ensure the proper environment for the concrete to cure.



