IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

October 26, 2001
(Click for hi-res image)
Pedestal Construction
Installation of forms and rebar for the pedestal footing began following the placement of the second concrete
coating. The footing will be 1 meter thick, and extends past the walls of the pedestal by 1 meter all the way around.
The footing will support all of the weight of the concrete pedestal, as well as the steel antenna structure.