IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

April 18, 2002
(Click for hi-res image)
Pedestal Construction
Final preparations for the concrete placement of the pedestal roof were being finished. This included the precise
placement of the anchor bolts for the azimuth track with the aid of a surveying crew.



