IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

August 9, 2002
(Click for hi-res image)
Steel Erection
At the DSS-55 construction site work continues on the erection of the alidade steel structure. The first pieces of
the beam waveguide tube, which transfers the radio frequency energy from the focus of the main reflector into the
pedestal room, were installed.



