IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

December 5, 2002
(Click for hi-res image)
Steel Erection
Welding on the main reflector structure has now been completed. Each of the welds is now being inspected
and tested. The entire reflector structure will be painted before being lifted into place, assuming that the weather
conditions cooperate.



