IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

July 4, 2002
(Click for hi-res image)
Pedestal Construction
Work continued on grouting below the azimuth track. Once this is completed, the wheel assemblies will be
installed. The last of the major concrete work was completed when the concrete for the second ramp wall was
placed.