IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

June 29, 2002
(Click for hi-res image)
Mechanical Fabrication
The azimuth trucks are in final assembly in Tarragona, and should be shipped to the construction site by
July 5.



