IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

May 30, 2002
(Click for hi-res image)
Pedestal Construction
At the construction site work has begun on the back fill around the pedestal including the installation of the
secondary drain system around the base of the pedestal footing, the application of the water proof barrier to the
concrete, and the filling and compacting of the excavation.



