IMAGE GALLERY:
Madrid Complex | Madrid Construction Site

November 27, 2002
(Click for hi-res image)
Steel Erection
The weather has cooperated a little better this week so good progress has been made on the welding of the
main reflector structure. The contractor is still optimistic about doing the main reflector lift prior to the holiday
shutdown.



